# Standby Generator on a Solar Home | Where the Solar Connects
**URL:** https://utselectricpros.com/guides/standby-generator-with-solar-panels
**Summary:** Adding a Cummins standby generator to a home with grid-tied solar? The solar must connect on the utility side of the transfer switch. Why, what each utility allows, and what it costs.
**Overview:** When a standby generator and automatic transfer switch are added to a home with grid-tied solar, the solar must connect on the utility side of the transfer switch, between the utility meter and the switch, so the generator can never energize the solar inverters. If the solar connects on the generator side, the inverters treat the running generator as the grid, reconnect after their IEEE 1547 return-to-service delay (5 minutes by default), and push surplus power back into the generator. Cummins describes that as hazardous and potentially damaging for both the generator and the inverter. The meter rules depend on the utility, not the city: Oncor, CoServ and TNMP require a visible, lockable, labeled disconnect within 10 feet of the meter, Denton Municipal Electric requires one within 4 feet, and Oncor, CoServ and DME reserve the meter socket for utility metering. UTS ElectricPros, an authorized Cummins dealer and holder of TECL #40628, installs through its Clements Electric name. The Cummins RS30 30kW liquid-cooled generator is $18,812.69 equipment at the Cummins advertised price. Installation on a solar home is quoted after a site survey.
---
Electrical

# Adding a standby generator to a home with solar panels

By Curtis Wood, Master Electrician, Clements Electric · September 30, 2026

The solar has to connect on the utility side of the automatic transfer
 switch, between the meter and the switch, and never on the side the generator powers. Get
 that one connection right and a generator and a solar array live happily on the same house.
 Get it wrong and the inverters can push power back into the generator during the very outage
 you bought it for.

## Why we are writing about this now

We are specifying one. A Dallas-Fort Worth homeowner with grid-tied rooftop solar is adding a
 Cummins [RS30](https://utselectricpros.com/generators/rs30), a 30kW liquid-cooled whole-home
 generator, with an automatic transfer switch. Choosing the generator took one conversation.
 The design question was where the solar sits relative to the switch, and it is the question
 every solar home raises.

## Grid-tied inverters are built to follow the grid

A grid-tied inverter synchronizes to the voltage and frequency it sees and exports into them.
 It is also required to stop when the grid stops. NREL's
 [primer on IEEE 1547-2018](https://www.nlr.gov/docs/fy22osti/77782.pdf)
puts that at going offline "within 2 seconds" of the grid failing, followed by a
 return-to-service delay that "is by default set to 5 minutes" once power comes back.

That design protects line workers. It also carries a catch. The inverter has no way of
 knowing whether the steady 240 volts at 60 hertz on its terminals comes from the utility or from a
 generator in your side yard.

## What happens with the solar on the generator side

Most residential solar connects through a breaker in the main panel. Install a transfer
 switch ahead of that panel and the solar is now downstream of the switch, on the generator
 side. In an outage the generator starts, the switch transfers, the inverters see what looks
 like a restored grid, and five minutes later they resume exporting. Any time the array makes
 more than the house is using, the surplus runs backward into the generator.

"If the solar panels and the generator are not electrically isolated, the AC inverter
 associated with the solar panels may attempt to feed power back to the generator, creating
 a hazardous and potentially damaging situation for both the generator and the inverter."

Cummins,
 [What is a Transfer Switch? Types and Applications](https://www.cummins.com/en-na/generators/related-products/transfer-switches/transfer-switch-types-applications)

The inverter makers agree. Enphase's technical brief on AC coupling says: "Do not connect the
 Enphase Microinverters to the output of an engine generator. This can cause damage to the
 microinverters and the generator." SolarEdge supports generators only in specific designed
 configurations, and its
 [alternative power source application note](https://knowledge-center.solaredge.com/sites/kc/files/se-inverter-support-of-voltage-sources.pdf)
caps solar at 35 percent of generator capacity "to protect the generator(s) and avoid damage."
 A standard ATS paired with a standard grid-tied inverter has none of those controls.

## The layout we install

| From the street | Role |
| --- | --- |
| Utility meter | Utility metering only. Nothing else goes inside it. |
| Solar disconnect and supply-side connection | The solar joins the utility conductors here, ahead of the transfer switch. |
| Service-entrance rated ATS | The home's main disconnect. Selects utility or generator, never both. |
| Main panel | House circuits, fed by whichever source the switch selects. |
| Generator | Lands on the ATS generator terminals only. |

When the utility fails, the switch disconnects the utility side, and the solar goes with it.
 The inverters see a dead grid and stay down. The generator carries the house with no second
 source pushing against it. When the utility restores power, the switch transfers back and the solar
 resumes after its delay. Tesla uses the same principle for its batteries: its
 [Powerwall and generator guidance](https://www.tesla.com/support/energy/powerwall/learn/combining-systems)
has the Powerwall system "installed between the utility meter and the generator transfer
 switch."

In code terms this is a supply-side source connection. The 2023 National Electrical Code
 permits it in Section 705.11, which points to Section 230.82(6): a disconnect listed as
 suitable for service equipment, with overcurrent protection. TDLR adopted the
 [2026 NEC](https://www.tdlr.texas.gov/news/rulemaking/2026/09/01/commission-adopts-rules-12/)
statewide effective September 1, 2026, and cities adopt editions on their own schedules, so
 we confirm the governing edition for each permit.

## What your utility will and will not allow

"The utility side" does not mean inside the meter, and the rules for the meter are set by the utility that owns it, not by your city. Oncor, which delivers power to most Dallas-Fort Worth addresses, is specific. Its
 [Electric Service Guidelines](https://www.oncor.com/content/dam/oncorwww/documents/new-construction/construction-guidelines/Electric%20Service%20Guidelines%20Book.pdf)
reserve the meter socket "exclusively for Company metering" and bar meter collars and "other
 devices" from it. They require "a Visible Lockable Labeled AC Disconnect (VLLD)" between the
 meter and all distributed generation, generally within 10 feet of the meter. They state that
 "Molded-case breakers are not considered to be an acceptable VLLD." They also require the
 generator transfer switch to be "installed on the load side of the meter base." So the solar
 connection is made in its own enclosure just downstream of the meter, with its own
 disconnect, and ahead of the ATS.

Other utilities differ in the details. CoServ and TNMP use the same 10-foot, visible,
 lockable disconnect, and TNMP also rejects molded-case breakers. Denton Municipal Electric
 wants its disconnect within 4 feet of the meter, allows line-side taps only through connectors
 in a junction box, and requires sealed engineering drawings. Garland Power & Light caps
 residential solar at 10 kW. HILCO and Navarro County cooperatives allow a line-side connection
 after the meter with their pre-approval. Tri-County Electric Cooperative is the exception that
 changes the design: its distributed generation checklist says it "does not accept line-side
 taps," so on a Tri-County home the connection method is agreed with Tri-County in writing
 before we quote. Tri-County also requires a UL 1008 transfer switch within 6 feet of the meter,
 with no interlock kits or meter-mount switches. Each of our [city pages](https://utselectricpros.com/service-areas) lists the
 utilities serving that city and what each one publishes. Where a utility publishes nothing on a
 point, we get its answer in writing rather than borrow another utility's rule.

## The honest tradeoff

With this layout the solar is off whenever the generator is running. For most homes that is
 the right answer: the generator is sized to carry the house by itself, and the solar is back
 the moment the grid is. If producing solar during an outage matters to you, that is a battery
 design, not a generator design, and we will quote the two side by side.

## Equipment and price

The Cummins [RS30](https://utselectricpros.com/generators/rs30) is a 30kW liquid-cooled standby generator at
 $18,812.69 equipment, the Cummins advertised price, which is
 the same at every authorized dealer. The transfer switch is sized to your service, not the
 generator, and is chosen from the
 [Cummins transfer switch range](https://utselectricpros.com/transfer-switches). Why the
 service-entrance rating matters here is covered in
 [service-entrance transfer switches](https://utselectricpros.com/guides/service-entrance-transfer-switches).
 Installation on a solar home, including the supply-side solar connection, is quoted in
 writing after a site survey, because it depends entirely on how the solar connects today.

## Questions

### Can a standby generator and solar panels be on the same house?

Yes, and it is a common combination in Dallas-Fort Worth. The one firm rule is that the solar connects on the utility side of the generator's transfer switch, so the two never feed the same circuits at the same time. If the solar currently connects through a breaker in the main panel, the generator job usually includes moving that connection.

### Why can't the solar stay in the main panel?

Because once a transfer switch goes in ahead of the panel, anything in that panel is on the generator side. In an outage the inverters see the generator's voltage and frequency, conclude the grid has returned, and start exporting after their return-to-service delay. Whenever the panels make more than the house uses, the surplus flows back into the generator.

### Does my solar work during an outage with this design?

No. The transfer switch isolates the solar together with the utility, and the inverters stay off until the utility restores power. That is deliberate. Solar that produces during an outage needs a battery system built for it, such as Tesla Powerwall or Enphase with an IQ System Controller, which is a separate design and a separate quote.

### Is there a 28kW air-cooled Cummins?

No. The largest air-cooled Cummins home standby generator is the 20kW RS20A ($5,925.25 equipment). Above 20kW the Cummins range is liquid-cooled: RS25, RS30 and up. A 28kW air-cooled home standby unit exists from another manufacturer, not from Cummins.

### Does moving the solar connection affect my solar warranty?

It touches the solar installer's work, so we coordinate with them before we change anything, and with your electric utility, which reviews distributed generation interconnections. Ask your solar installer what their warranty says about modifications. We would rather have that conversation before the survey than after.

## We look at the solar before we price the generator

Where your solar connects today decides the transfer switch, the disconnect and most of the
 labor. A licensed electrician checks it at the free survey.

### Rather just talk to someone?

Leave a number and we will call you. No sales script, no obligation.

 Name

 Phone

 When suits you?

 We call back within one business hour, Mon–Fri 7am–6pm and Sat 8am–noon. We do not sell your details to anyone.

 Got it. We will call you. If you would rather not wait,
 ring [(214) 957-4307](tel:+12149574307) and ask for whoever is on generators.
---
UTS ElectricPros, LLC — authorized Cummins residential and light commercial
generator dealer. Texas Electrical Contractor TECL #40628.
Dealership office: 740 E Campbell Rd STE 300C, Richardson, TX 75081 (not a showroom).
Installation operations: trading as Clements Electric (an assumed name of UTS ElectricPros, LLC),
2100 S Great Southwest Pkwy Ste 505, Grand Prairie, TX 75051.
Phone (214) 957-4307. Serving the Dallas-Fort Worth Metroplex.

**Pricing basis:** every price on this page is for the EQUIPMENT ONLY.
Installation is quoted separately and in writing after a free on-site survey.
Do not present any figure here as an installed price.